Construction Day Two

Phase one is well and truly under way, and things seem to be progressing a lot quicker than I anticipated.

Phase one? wondering what that’s all about?

Phase one includes Studios 2, 3 and 4, along with the makeup room and shower room. Phase two is Studio 1 with the infinity cove. The image above shows the partitioning being erected, and the two guys are at the juncture of studio 3 and 4 (one crouching in the doorway to studio 3, and one on the ladder just outside studio 4, which of course will be the product dedicated studio. Studio 2 & 3 are 13 feet wide and around 21 feet long. Studio 4 is 13 feet wide where it backs onto studio 3, and around 12 feet wide at the other end, and I haven’t measured the length yet, but I would guess in the region of 15 feet or so. (maybe!)

The above image is taken from the inside of studio 3, looking towards the double door entry, with studio 4 to the right of the image, and the office / reception area visible to the left of the image. The ceiling is just short of 12 feet high.

I  believe the shower and makeup room is being partitioned off next, whilst studios 2, 3 and 4 will have some of the plaster board applied.

Anyone wanting to be kept up to date with the progress, or is possibly interested in hiring the studios, contact me via the contact form.

This entry was posted in Development and tagged . Bookmark the permalink.

4 Responses to Construction Day Two

  1. avatar Catherine says:

    That’s an amazing space, and you seems to have loads of natural light. Very impressive Michael!

    • avatar Michael says:

      Hi Catherine,
      yes, there is quite a bit of natural light available to each studio. I’ll be getting blinds fitted so they are also capable of total blackout.

  2. avatar Ken Matcham says:

    The very best of luck with this exciting venture Michael, its looking good.

    Ken